Prefeasibility Assessment of Crude Pipeline Reuse for CO2 and H2
Photo by SPSE
Project description
Carbon Limits together with Aker Solutions carried out for the account of SPSE a pre-feasibility study to investigate the potential to reuse some of their pipelines for transport of other fluids (including CO2 / H2). The study included high-level assessments of safety, pipeline integrity, material compatibility, pipeline design, flow assurance, economics, business opportunities and local regulations.