CDM Project: Development of PDD and Pre-Verification Consulting for the Al-Shaheen Flare
Project description
Carbon Limits has been tasked to provide the following services
- Preparation of emission reduction Monitoring Report for more than 5 years
- Preparation of the Project Design Document (PDD) for renewal of the crediting period
- Review of verification and certification reports submitted by the DOE
- Training the personnel involved in CDM activities for the on-site verification and validation
- Developing CDM specific procedures to demonstrate the integrity of the monitoring & reporting processes and systematic communications to the DOE
- Conducting internal audits and training of CDM personnel to reduce potential risks associated with validation of the PDD & verification of the CERs
- Accompanying the DOE during the two site visits (verification and validation).